Senawang Integrated Industrial Park

Current Project | Senawang Integrated Industrial Park

PROJECT INFORMATION

22 units 2 & 3 storey link factory at Lot 61171 – 61192, Pekan Senawang, Daerah Senawang, Negeri Sembilan Darul Khusus.

The development consists of 4 types of the Factories

Type A – 3 storey factory (30’ x 100’) – 2 units Built Up: 5,538 sq ft
Type A1 – 2 storey factory (30’ x 100’) – 8 units Built Up: 4,155 sq ft
Type B1 – 2 storey factory (30’ x 85’) – 10 units Built Up: 3,712 sq ft
Type B – 3 storey factory (30’ x 85’) – 2 units Build Up: 5,095 sq ft

Floor Loading
1) Ground Floor – 10KN/m²               2) 1st Floor – 7.5KN/m²                3) 2nd Floor – 7.5KN/m²

Ceiling Height
1) Ground Floor – 16’           2) 1st Floor – 12’          3) 2nd Floor – 12’           4) Warehouse – 28’

Download Project Brochurepdf

or call us at +603-3324 3888

2-STOREY
SPECIFICATIONS

STRUCTURE
Foundation Framework (Office, Factory):
Reinforced Concrete Framework

WALLS
Office, Factory: Ceramic Wall Tiles

DOORS
Plywood Flush Door & M.S. Roller Shutter

ROOF STRUCTURE
Steel structure Frame with Metal Deck Roofing with Insulation

CEILING
Ground Floor: Skim Coating
1st Floor: Aluminium T-bar Suspended Ceiling

WINDOWS
Aluminum Frame Window Panel

FLOOR FINISHES
Factory: Floor Hardener
Toilet: Ceramic Tiles
Office: Cement Render
Others: Cement Render

WALL FINISHES
Factory: Cement Sand Plaster and Painting
Toilet: 5′ High Ceramic Tiles
Office: Cement Sand Plaster and Painting
Others: Cement Sand Plaster and Painting

SANITARY FITTINGS
Sitting WC: 4 Nos
Paper Holder: 4 Nos
Wash Basin: 2 Nos
Sink: 2 Nos
Urinal Bowl: 2 Nos

ELECTRICAL FITTINGS
Lighting Points: Adequate points
13Amp Switched Socket Outlet: Adequate points
30A TPS Isolator: 1 Nos
Telephone Outlet: 2 Nos

OTHERS
Rubbish Chamber

FLOOR PLANS

senawang-floor-plan-2sty


3-STOREY
SPECIFICATIONS

STRUCTURE
Foundation Framework (Office, Factory):
Reinforced Concrete Framework

WALLS
Office, Factory: Cement Sand Bricks

ROOF STRUCTURE
Steel structure Frame with Metal Deck Roofing with Insulation

CEILING
Ground Floor: Skim Coating
1st Floor: Skim Coating
2nd Floor: Aluminium T-bar Suspended Ceiling

WINDOWS
Aluminum Frame Window Panel

DOORS
Plywood Flush Doors & M.S. Roller Shutter

FLOOR FINISHES
Factory: Floor Hardener
Toilet: Ceramic Tiles
Office: Cement Render
Others: Cement Render

WALL FINISHES
Factory: Cement Sand Plaster and Painting
Toilet: 5′ High Ceramic Tiles
Office: Cement Sand Plaster and Painting
Others: Cement Sand Plaster and Painting

SANITARY FITTINGS
Sitting WC: 6 Nos
Paper Holder: 6Nos
Wash Basin: 3 Nos
Sink: 3 Nos
Urinal Bowl: 3 Nos

ELECTRICAL FITTINGS
Lighting Points: Adequate points
13Amp Switched Socket Outlet: Adequate points
30A TPS Isolator: 1 Nos
Telephone Outlet: 2 Nos

OTHERS
Rubbish Chamber

FLOOR PLANS

senawang-floor-plan-3sty


Site Location